Zephyr CPA-E42ASX Guia de Instalação Página 18

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 27
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 17
18
13. Optional duct cover installation:
a. Remove the support bracket from the Duct Cover
assembly and attach it to the ceiling with 2 drywall
anchors and screws
Note: The printed index on the bracket must match
the center line previously drawn (See installation
step 2).
Conduit
Duct
Position
reference
Position
reference
CenterLine
Duct cover
support barcket
Installation - Installing the Duct Covers
Unscrew the 4 screws that fix the section of the Duct
Cover (Starting collar) and release all parts.
Install the upper section to the support bracket with
2 screws.
Note: Check that joined seam is positioned towards
the back.
Note2: The lower section (Collar) of the duct cover
assembly must be installed at the end of the
installation with 2 screws.
Support
Bracket
Upper
section
Lower
section
(Collar)
Vista de página 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 26 27

Comentários a estes Manuais

Sem comentários