Zephyr ZTO-M79S Guia de Instalação Página 8

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 16
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 7
INSTALLATION
INSTALLATION
EZ ANCHORS
Tap EZ anchor tip into marked drywall
locations, turn with screwdriver until seated
flush.
Note: Whenever possible, the hood should
be secured to wall studs.
Use EZ anchors provided only on hollow
drywall applications (minimum drywall
thickness ½”). If a stud or wood surface is
present, fasten anchors with screws directly
into stud or plywood. For all other wall
types (concrete, brick, tiles etc.), use
appropriate anchors for mounting.
6
Vista de página 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Comentários a estes Manuais

Sem comentários