Zephyr ZML-E42BS Guia de Instalação Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 11
10
www.zephyronline.com
FRONT
FRONT
1
2
FIG. C
5. Lift support frame assembly up to the ceiling making sure the the word “front” on the top support frame faces the
front of the hood where the controls will be located (FIG. D). The key-holes on the top support frame should cover
the wood screws previously installed in the ceiling. Slide support frame towards narrow end of key-holes to lock
the frame in place.
6. Install the last (2) M6 x 1-1/2” wood screws with washers into the two remaining corners of the top support frame
to secure it to the ceiling. Tighten all screws.
Installation – Mounting the Hood
FIG. D
FIG. E
3. Hood heights between 40” to 50” require lateral support brackets
to be installed to the two top support frame cut off arms and their
corresponding bottom support frame arms. Install lateral support
brackets by (12) M4 x 8 sheet metal screws. (FIG. C)
4. Hood heights between 45” to 50” require a square support bracket
to be installed inside the support frame. Install square support
bracket to top support frame arms by (8) M4 x 8 sheet metal
screws. (FIG. E, #1) Top support frame arms extend past lower
support frame bracket with shorter hood heights. (FIG. E, #2)
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 47 48

Comentários a estes Manuais

Sem comentários